Select Projects

We've worked on an incredible range of projects across our five companies. Explore a selection of that work here, or visit each company's website for the full range.
Company
Project By Company
  • South East Construction
  • Core Industrial
  • KDM Constructors
  • Tundra Mechanical
Industry
Project By Industry
  • Mining
  • Industrial
  • Construction
  • Institutional
  • Agriculture
  • Earthworks
  • Power
Reset
  • Coarse Ore Bin Replacement

    South East Construction
    Mining
  • Loadout Screw Floor Replacement

    South East Construction
    Mining
  • Bridge Crane Installation

    South East Construction
    Mining
  • CG002 Brownfield Mill Upgrades

    South East Construction
    Mining
  • Headframe Demolition

    South East Construction
    Mining
  • Raw Ore Hopper Replacement

    South East Construction
    Mining
  • Rotary Dryer – Uphill Tire and Overhaul

    South East Construction
    Mining
  • Process Tank Demolition

    South East Construction
    Mining
  • Screw Conveyor

    South East Construction
    Mining
  • Stormwater Pumphouse

    South East Construction
    Mining
  • Storage Building Tripper Conveyor

    South East Construction
    Mining
  • Overdense Tank Repairs

    South East Construction
    Mining
  • Floatation Floor Refurbishment

    South East Construction
    Mining
  • String Filter Replacement

    South East Construction
    Mining
  • Intake Tunnel Rehabilitation

    South East Construction
    Mining
  • Beehive Repairs

    South East Construction
    Mining
  • Buried Ammonia Pipeline

    South East Construction
    Mining
  • Gallery Refurbishment

    South East Construction
    Mining
  • TMA Stripping

    South East Construction
    Mining
  • Scrubber Building Refurbishment

    South East Construction
    Mining
  • Scrubber Stack Replacement

    South East Construction
    Mining
  • Thickener Drive Upgrade

    South East Construction
    Mining
  • Transfer House Earthworks

    South East Construction
    Mining
  • Headframe Outfitting

    South East Construction
    Mining
  • Drag Conveyor Replacement

    South East Construction
    Mining
  • Hoist Cooling System

    South East Construction
    Mining
  • Gallery Dust Collection

    South East Construction
    Mining
  • Transfer House Structural Erection

    South East Construction
    Mining
  • Sub-collar Shaft Door Replacement

    South East Construction
    Mining
  • Belt Conveyor Upgrades

    South East Construction
    Mining
  • Tripper Conveyor Replacement

    South East Construction
    Mining
  • South Line Evaporator Repairs

    South East Construction
    Mining
  • Rotary Dryer Refurbishment

    South East Construction
    Mining
  • Heater Refurbishment

    South East Construction
    Mining
  • Loadout Screening Upgrade

    South East Construction
    Mining
  • Raw Ore Upgrades

    South East Construction
    Mining
  • Compactor Rebuild

    South East Construction
    Mining
  • Fines Centrifuge Replacement

    South East Construction
    Mining
  • Fluid Bed Dryer

    South East Construction
    Mining
  • Headframe Tower Crane Foundation

    South East Construction
    Mining
  • Compaction South Wall Replacement

    South East Construction
    Mining
  • KCL Loadout Centrifuge Replacement

    South East Construction
    Mining
  • Underground Projects

    South East Construction
    Mining
  • Concrete Columns & Structural Repairs

    South East Construction
    Mining
  • Conveyor Belt Replacements

    South East Construction
    Mining
  • Shaft Loading Pocket M,P, E&I

    South East Construction
    Mining
  • South Headframe Hoist Installation

    South East Construction
    Mining
  • South Headframe Outfitting

    South East Construction
    Mining
  • Monorail Installation

    South East Construction
    Mining
  • Rig Mat Road and Lease Builds

    Core Industrial
    Mining
  • Pond Slope Remediation

    KDM ConstructorsCore Industrial
    Mining
  • Sort Projects