SEC completed the construction and conversion of an existing refrigeration plant on a hoist cooling system. The overhaul required supplying and installing cooling piping, valves, a heat exchanger, instrumentation and electrical, pressure testing and commissioning.
![](https://secongroup.ca/wp-content/uploads/2024/04/Hoist-Cooling-System-0-scaled-1-1024x768.jpg)