SEC completed a tower crane foundation for our client during late fall of 2020. This project consisted of hydro vaccing the perimeter, installing piles, excavating the foundation footprint, pouring a mud slab, dowelling into existing foundation, forming, pouring, heating & hoarding due to the weather conditions, & cooling/monitoring of the concrete. It was expedited for the client and finished on time incident and injury free.
![](https://secongroup.ca/wp-content/uploads/2024/04/Headframe-Tower-Crane-Foundation-0-1024x1005.jpg)