South Headframe Hoist Installation

Mining

2021

Project Details

SEC was contracted by ABB to install the K3 South Shaft Production Hoist. the work consisted of foundation preperation, Installation of all hoist components (Bearing, drives, shaft, drum), lubrication units and tubing and deflection sheaves.