South East Construction installed Geocell material on the sides of a run-off pond at BHP Billiton’s Jansen Mine Site. The Geocell was then backfilled with aggregate using a long-reach excavator. The purposes of this was to mitigate erosion and disturbance to the sides of the pond due to wave and ice activity.