Geocell Installation and Back Fill

Description

South East Construction installed Geocell material on the sides of a run-off pond at BHP Billiton’s Jansen Mine Site. The Geocell was then backfilled with aggregate using a long-reach excavator. The purposes of this was to mitigate erosion and disturbance to the sides of the pond due to wave and ice activity.

Details

Company
SEC

Category
SEC

Completed
2015

Location
Jansen Site, SK